Rear porch and breakfast (before) |
Rear of house (after demo) |
We have had a few dumpster loads of trash...musty old insulation, yucky pet stained subfloor, and old carpet. All in all, we are thankful that most of the things will be used and loved by other folks that need it!
The interior walls, sheetrock, floors and tile came out in the first two weeks. It was exciting to stop in each night to see the progress. Our builder, Vernon Knight & team, with Heard-Ratzlaff Contruction, are doing an amazing job. By week three the screened porch and breakfast room had come down off the back of the house.
Family Room to Kitchen (after demo) |
By week four, footings were poured for the new addition and the foundation is being laid.